After some planning and discussions with the client we drafted some drawings to form the basis of this little renovation. Taking in a new bathroom, new aluminum double glazed windows, demolishing an existing steel garage to enable the installation of new water tanks then rebuilding on a new slab in keeping with the existing residence with laundry. The existing residence had the asbestos removed from inside the bathroom, sunroom and exterior wall which was re-clad in Axon smooth once the windows were installed. The existing bathroom and toilet have been separated remodeled with striking tiles, spotted gum vanity, mirror, and black tapware. A new deck was added with bluestone paving pathways, veggie boxes and retaining walls to finish off after the removal of the asbestos outbuilding. |
Categories
All
Archives
August 2021
Top 10 Tips To Increase Your Homes Value Before Selling |